FSM software for EV charging installers
FSM Flow runs a charger’s whole life on one record: load calculation, permit, make-ready, trenching, commissioning and network onboarding, then the SLA tickets, firmware fixes and preventive rounds that keep it charging. Dispatchers see every port, every tech and every clock on one board.
- 14-day free trial
- No credit card required
- Set up in minutes

SLA ticket closed
Port 2 back online · firmware updated · 3h 40m to repair
At a glance
EV charger installer software is field service management software built for contractors who install and maintain electric vehicle supply equipment (EVSE): Level 2 chargers for homes, workplaces and multi-unit dwellings, and DC fast chargers for fleets, retail sites and highway corridors. It manages the install as a project with external gates such as permits, utility make-ready and inspection, then tracks each charger by serial number, firmware and connector type through years of uptime-SLA repair and preventive maintenance. FSM Flow does both from one customer and site record, so the technician who answers a down-port ticket sees the commissioning photos from the day the unit went live.
Reliability is the industry’s problem to solve. ChargerHelp’s 2025 EV Charging Reliability Report, covering more than 100,000 sessions, found that nearly one in three public charge attempts fails and that charge success falls from 85% at new stations to below 70% by year three. Federally funded fast chargers under the NEVI program must average at least 97% annual uptime per port, and many state regulators and site hosts now write the same number into contracts. J.D. Power reports 14% of EV owners still left a public station without charging in 2025. Every one of those failures is a ticket, a clock and a truck roll.
FSM Flow turns that into a managed service line. Alerts from your network platform can open prioritised work orders through the workflow builder’s webhook trigger, AI matching sends the nearest technician with the right connector spares, the mobile app logs the fix and the new firmware version against the exact port, and the reporting module produces the uptime and repair-time figures your funders and site hosts ask for.
250,000+
US public charging ports by mid-2026, including 73,000+ DC fast ports
Source: US DOE Alternative Fuels Data Center
1 in 3
Public charge attempts that fail (2025 report, 100,000+ sessions, 2,400 chargers)
Source: ChargerHelp, 2025 EV Charging Reliability Report
97%
Minimum average annual uptime per port for NEVI-funded fast chargers (requirement in force 2026)
Source: FHWA NEVI standards (23 CFR 680); Maryland PSC Order 90971
14%
EV owners who left a public charger without charging in 2025, down from 19% in 2024
Source: J.D. Power, 2025 EVX Public Charging Study
Job types
Each job type carries its own checklist, required certifications, duration and SLA priority, so a down-port ticket and a four-week DCFC build both land on the scheduler knowing what they need.
Site assessment & load calculation
Service capacity, panel photos and load calcs captured on site; the quote follows from the same visit.
Service & panel upgrade
Electrician skill matching, with permit and utility paperwork tracked as a phase of the install project.
EV energy management (EVEMS) install
Load-managed multi-charger installs with controller settings recorded on the equipment record.
Level 2 residential install
NEMA 14-50 or hardwired units scheduled by proximity, with photos and a one-click invoice on completion.
MDU & workplace Level 2 banks
Multi-day projects with crews, trenching, conduit runs and per-port serials under one site record.
DC fast charger site work
Switchgear, transformer pad, bollards and utility make-ready coordination as tracked phases with documents.
Commissioning & network onboarding
OCPP ID, firmware version and connector type recorded as the charger goes live on the network.
Uptime-SLA break-fix dispatch
Priority tickets with a response target, matched to the nearest tech carrying the right connector parts.
Firmware update & connectivity fix
Modem swaps and firmware revisions logged per unit so repeat offenders are visible in the history.
Cable & connector replacement
CCS and NACS cable swaps with part numbers linked to the job and to the stock they came from.
Preventive maintenance round
Filters, torque checks, thermal inspection and payment-terminal test on a recurring schedule per site.
Warranty RMA & payment terminal repair
Manufacturer claims and no-charge visits tracked separately from billable SLA work.
Where time gets lost
The problems that show up on every dispatcher’s screen and in every quarterly uptime report, and what FSM Flow does about each one.
A port goes down and the SLA clock starts before anyone knows.
The workflow builder’s webhook trigger lets your network platform or monitoring tool open a work order the moment it raises an alert, with the site, the port and an emergency priority already set. The ticket sits at the top of the unassigned pool until a dispatcher drags it onto a tech.
See how it worksEvery charger looks the same in a spreadsheet.
Each EVSE unit is an equipment record under its site with serial, kW rating, connector type, firmware version, OCPP ID and install date. Service history accumulates on the unit, so the 3.5% of stations that cause most of the downtime become visible by name.
See how it worksInstalls stall waiting on permits, make-ready and inspections.
Each phase of a DCFC or MDU project is a work order with a status and an on-hold reason such as awaiting utility make-ready or inspection scheduled. The dashboard shows how long each project has waited at each gate.
See how it worksSites are 200 miles apart and techs drive past each other.
AI technician matching weighs skill, EVITP certification and proximity for every ticket, and the week view shows the whole territory so PM rounds are grouped with nearby repairs. Route optimisation is coming soon.
See how it worksUptime reporting for funders and site hosts is assembled by hand.
Ticket open and restore timestamps per port feed the custom report builder, so uptime percentage, mean time to repair and first-time fix are produced per site, per customer and per programme without a spreadsheet.
See how it worksEVITP and licence requirements vary by project and state.
Certifications sit on technician profiles with expiry dates. Job types can require EVITP for state-funded work, and the scheduler only suggests technicians who hold it, so the crew that arrives matches the contract.
See how it works
Built for EV charging installers
One platform for installs, SLA repair, preventive maintenance and the AI that connects them.
SLA-aware scheduling & AI dispatch
A drag-and-drop board with day, week and month views, emergency priority and AI matching by skill, certification and proximity.
- Down-port tickets flagged and sorted by priority
- EVITP and electrician licence matching
- Install crews and service techs on one board
Serialised charger register
Every EVSE unit, transformer, switchgear cabinet and payment terminal recorded under its site from commissioning to retirement.
- Serial, kW, connector, firmware and OCPP ID per unit
- Repair history and parts fitted on the record
- Lifecycle view for ageing stations
Install projects with external gates
Load calc, permit, make-ready, civil works, electrical, commissioning and network onboarding as linked work orders with documents.
- On-hold reasons for permit, utility and inspection
- Plans, permits and inspection results attached
- Progress visible per site and per programme
Preventive maintenance & SLA contracts
Service contracts that define response targets, PM intervals and included work per site, generating visits automatically.
- Quarterly or semi-annual PM rounds per site
- Response and restore targets on each ticket
- Renewal reminders before contracts lapse
Quotes & invoicing
Quotes with line items and expiry for installs and maintenance plans; invoices generated from completed work orders in one click or in bulk.
- Phase invoices for multi-week DCFC builds
- Billable SLA work separated from warranty
- Customisable tax, terms and templates
AI assistant & workflows
Ask “which sites breached their restore target this month?” or let a webhook from your network platform open the ticket for you.
- Webhook, schedule and entity-event triggers
- Natural-language questions on live ticket data
- AI dashboards for uptime and MTTR
A day with FSM Flow
How a 25-technician installer and O&M provider covering three states handles a DCFC build, a Level 2 bank and the day’s down-port tickets.
- 6:00 am
Overnight alerts are already tickets
Two network alerts arrived overnight through the webhook trigger and created emergency work orders with site, port and connector type filled in. They sit at the top of the unassigned pool.
- 7:15 am
Dispatch assigns the SLA tickets
AI matching suggests the technician 40 minutes from the first site who carries the right CCS cable assembly. One drag and the restore clock has an owner.
- 8:30 am
DCFC crew on the transformer pad
The civil crew opens the site-work phase on the mobile app, logs the trench and conduit run with photos and marks the phase ready for the electrical crew.
- 10:45 am
Workplace Level 2 bank commissioned
Twelve ports are scanned to the site record with serial, firmware and OCPP ID. The commissioning checklist closes the install phase and a workflow emails the customer the hand-over pack.
- 1:30 pm
Down port restored, cause recorded
The tech replaces a failed cellular modem, updates firmware, runs a test session and closes the ticket. The part is linked to the job and deducted from van stock.
- 3:00 pm
Permit hold cleared on the MDU project
The permit approval is attached to the on-hold work order and its status moves to scheduled; the dispatcher books the panel-upgrade crew for Thursday.
- 5:00 pm
Uptime report for the site host
The office runs the monthly report per site: uptime by port, mean time to repair and tickets by cause, and the AI assistant lists sites nearing their SLA threshold.
Compliance & records
FSM Flow stores the evidence against the project, the charger and the technician, so inspections, programme audits and warranty claims are a report away.
NEC Article 625 & permits
Load calculations, permit numbers, inspection outcomes and energy-management settings attached to each install, with checklists updated for the 2026 NEC.
EVITP certification
Certificates and expiry dates on technician profiles; California PUC §740.20 requires at least one EVITP-certified electrician per crew on most state-funded chargers, and 25% of crew electricians on projects of 25 kW or more.
NEVI uptime & reporting (23 CFR 680)
Ticket open and restore timestamps per port support the 97% average annual uptime calculation and the outage reporting that funded sites must submit.
Equipment listings & accessibility
UL 2202 and UL 2594 listing documents, ADA accessibility checks and payment-terminal tests recorded on the commissioning checklist.
Electrical safety
NFPA 70E live-work procedures and lockout checklists completed on the mobile app before work on energised switchgear, with the sign-off in the audit trail.
Utility make-ready & interconnection
Make-ready applications, utility correspondence and energisation approvals attached to the project, with on-hold reasons showing where the utility is the gate.
Numbers worth watching
Every one of these is a dashboard widget in FSM Flow, or a question you can ask the AI assistant.
Uptime % per port
Calculated from ticket open and restore timestamps against each port record; reportable per site, customer and funding programme.
NEVI minimum: 97% average annual uptimeMean time to repair (MTTR)
Hours from ticket creation to restore, split by cause code so connectivity, payment and power faults can be managed differently.
First-time fix rate
Driven by van stock and unit history; return visits are a separate job type linked to the original ticket so the number is honest.
Truck rolls per ticket
Visits logged per work order; repeat rolls to the same port surface the stations that need a different fix.
Days from contract to energisation
Quote acceptance to commissioning phase closed, per project and per utility, showing where make-ready and permits hold the pipeline.
Installs per crew-week
Completed install work orders against crew time logged, visible per crew and per charger class.
What is EV charger installer software?
How do EV charger installers track uptime SLAs in FSM Flow?
Can FSM Flow track charger serial numbers and firmware?
How do I schedule preventive maintenance for networked chargers?
Can it manage installation projects with permits, make-ready and subcontractors?
Does FSM Flow connect to my charging network or read OCPP data?
How much does FSM Flow cost for an EV charging contractor?
Keep exploring
Related industries
All industriesSolutions by job type
All solutionsReady to run your EV charging business on FSM Flow?